3: Attach the 5/4 x 2-1/4 x 11-1/2 Horizontal Window Supports at the bottom with 2 wood screws.
Use the inventory pages in the manual to make sure you have received all necessary parts. Step 15: Angle Supports 1: Four 2 x 4 x 13 Angle Supports are mounted underneath the deck on the left and right of the fort. 2. Go up on top of the deck and look out the left of the play set. Install the Swing Beam Support so that the counter-sunk holes on each end of the beam face out, and the counter-sunk holes in the center face down. Step 50: Tic Tac Toe 1: Assemble the Tic Tac Toe panel according to the instructions in the box. Note the counter-sunk holes face out. IGNORE Step 6 and Step 7 in the instructions.
Step 29: Rest Swing Beam on Fort *Two people are required for this step. The bottom edge of the 90o brackets should be 3/4 up from the bottom edge of the 2 x 4. Attach the roof supports to the Roof Peak Support with four 2 wood screws from the inside.
Step 33: Swing Leg Cross-Member 1: Position the 2 x 4 x 58 Swing Leg Cross-Member against the Swing Legs.
2: MAKE SURE THE FRONT ROOF EDGES ARE FLUSH TO ONE ANOTHER 3: FASTEN THE LEFT DORMER SIDE TO THE PEAK SUPPORT WITH #8 X 1-1/2" WOOD SCREWS.
PICTURE DESCRIPTION 90 GREEN BRACKET QTY. 2: Fasten the Roof Starter Boards to the Roof Supports with 1-1/2 wood screws.
(These are called out by the letter X) 2: Attach each Angle Support (X) to the Deck Support with two 2-1/2 wood screws at the top going through the Deck Support first and then into the Angle Support (X). 3: CENTER THE DORMER FROM SIDE TO SIDE ON TOP OF THE ROOF.
Step 36: Roof Starters/Roof Peak 1: Place the 1 x 5 x 52 (groove only) Roof Starter Boards at the peak of the roof. 4: Repeat this process attaching the other Face Board to the right side of the Right Corner posts. Step 49: Ground Stakes 1: Hammer a Ground Stake into the earth next to each swing leg at an angle. 3: INSTALL #8 X 1/2" PAN HEAD SCREWS TO FASTEN THE SUNBURST TO THE ROOF SIDES.
3: Secure each Deck Board to the Deck Supports and the Deck Stringer with five 2 wood screws, two per end and one in the center. 4: Note: you may tie two knots in the Rope to aid in climbing if you wish. PICTURE DESCRIPTION 8' WIKI SLIDE 03-0015-G SWINGBELT W/CHAINS 04-0002 TRAPEZE BAR W/CHAINS 04-0006 SWING PLATE 11-5002 CLIMBING ROCKS (07-0008 IS A PACK OF 5) A-FRAME SWING LEG BRACKET QTY. Fall Zones - A fall zone, covered with a protective surfacing material, is essential under and around equipment where a child might fall. THE RETAILER DOES NOT STOCK COMPONENTS. There are seven Roof Boards on each side of the roof. Your playset may come with two different diameter lag screws. REPEAT SUBSTEPS 1 THROUGH 3 TO CONSTRUCT THE SECOND DORMER.
Step 25: Swing Beam Support 1. Place the carriage bolt into the torque washer, then into the hole of the corner post and set with a hammer. Step 6: Deck Supports 1: Attach one Deck Support (offset holes down) to the inside of the Left and Right Corner Posts with two 5/16 x 4-1/2 hex bolts and 5/16 washers. Place the barrel of a T-Nut in the hole at the top of the Ladder Side, and secure with a hammer.
Example: a tag reads "2-4-3600-BPB" The 2 is the thickness of the board. 2: Make sure the ladder is level.
3: Center the unit on the panel slats on the swing beam side of the play set. As with any home project, good judgment and respect for power tools will greatly reduce the risk of injury. Finally install the screw and washer.
Mark the position of the bracket holes on the 2 x 4. STEP 2: DORMER 1: PLACE THE PLASTIC DORMER SUNBURST AGAINST THE FRONT FACE SUPPORT ON THE LEFT AND RIGHT ROOF SIDES. 2. Common Installation Practice Installing T-nuts When installing T-nuts into the wood, use a smooth faced hammer to set the face of the T-nut flush into the wood. Adjust the Safety Handles up or down to suit the needs of your child. Step 21: Rock Wall 1.
Attach each Small Ray to the Roof Support and Sun with two 1-1/2 wood screws. Repeat this step for the other Ladder Side.
2: The 2 x 4 x 47-3/8 Panel Support (with two pre-drilled holes) attaches to the side of the Left Corner Posts, offset holes down, with two 5/16 x 4-1/2 hex bolts and two 5/16 washers. Protective Surfacing - Since almost 60% of all injuries are caused by falls to the ground, protective surfacing under and around all playground equipment is the most critical safety factor on playgrounds. 3: Attach the Panel Support to the right corner posts with two 5/16 x 3-1/2 lag screws and two 5/16 washers.
Step 2: Inserting T-Nuts Into Corner Posts 1: Use a hammer to seat the t-nuts after inserting them into the holes shown in the diagram below. Step 44: Climbing Rope 1: Thread one end of the Rope through the hole in the Rock Wall Side Top Panel Board. Attach each Bottom Panel Board with one 5/16 x 3-1/2 lag screw and one 5/16 washer. The quickest method to get any parts that are missing or damaged is to use our Quick Response Center located at: www.gorillaplaysets.com/support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY. Exposed equipment footings. Do this before performing sub step 3. Please inspect and inventory all parts immediately upon accepting delivery. Factory Stained Lumber that is naturally resistant to rot, decay, and insect damage. 2: Place a 2 x 6 x 16 Sun centered on top of the Sun Support. Play Set Surfacing Recommendations: Below are some of the recommendations that the U.S. Consumer Product Safety Commission (CPSC) offers from its Handbook for Public Playground Safety. 2: Fasten the Swing Legs to the Swing Leg Bracket with eight 3/8 x 3-1/2 lag screws and eight 3/8 washers. Do not hole the upper portion of the stake after the first couple of hits or it may vibrate harshly against your hand. Step 24: Attaching Rock Wall 1: The Rock Wall attaches to the left side of the play set, 11-3/4 from the outside edge of the front corner post.
Scattered debris, litter, rocks, or tree roots. playsets s playset Nantucket Model: 301 (BOXES: 301N-1, 301N-2, 320 & Slide Box) *51-0021-W* 51-0021-W Copyright 2016 Gorilla Playsets All Rights Reserved 190 Etowah Industrial Court Canton, GA 30114 www.gorillaplaysets. Step 3: Sandbox And Panel Support Board 1: The 2 x 6 x 47-3/8 End Sandbox Board (with four pre-drilled holes) attaches to the bottom of the Left Corner Posts, offset holes down with two 5/16 x 4-1/2 hex bolts and two 5/16 washers. Step 28: Iron Ductiles 1: Line up the holes of the Iron Ductiles with the holes in the Swing Beam. This product is intended for residential use only and not intended for use in any public setting. GORILLA PLAYSETS WARRANTY 2016 Gorilla Playsets (Gorilla) warrants its play sets to be free from defects in workmanship and materials, under normal use and conditions, for 10 years for above ground structural wood components and for one year for all other components (e.g., swings, hardware, plastics, tarps, rope ladder, etc.). Fasten the Swing Beam Support to the right corner posts using 3/8 x 6-1/2 carriage bolts and torque washers.
Attach the Rock Wall Board with four 2 wood screws.
Place one Rock Wall Board at the top of the Rock Wall Sides nearest the holes where you previously installed the tee nuts. Flush (Correct) Insert the barrel of the T-nut into the predrilled hole.
Using a smooth faced hammer, drive the T-nut until the face of the T-nut is flush to the wood. This picture shows an end view of the T-nut installed flush to the wood. If any of the following conditions are noted, they should be removed, corrected, or repaired immediately to prevent injuries.
The holes in the Roof Boards should be centered over the Roof Supports. General Info to Review Before Installation Depending on your experience, assembly of the playset can take as little as 6 hours up to 24 hours, depending on size, after inventory of parts; therefore, we recommend you set aside a full two days for assembly.
2: Use the hardware included (one 3/8 x 2-1/2 lag screw and one 3/8 washer) with the Steering Wheel to mount the Steering Wheel to the end of the Swing Beam. *Note - You may need to apply more than one gallon depending on swing set size, wood texture and porosity. Step 1: Corner Post Layout 1: This step is critical to building the fort properly.
Step 39: Sun Rays 1: All the sun ray pieces get installed to the inside surface of the Roof Supports and Sun pieces. HOW A T-NUT WORKS THE FIRST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T-NUTS INTO THE CORNER POSTS. This area should be free of other equipment and obstacles onto which a child might fall. Drill 3/8 holes where marked. Main beams are even pre-drilled! 2: The Deck Spacer side should be flush with the inside of the Panel Support. Offset Holes- Throughout the installation procedures we will refer to parts with offset holes. 2: Fasten the 5/4 x 3 x 23-7/8 Rock Wall Top Cap to the Rock Wall Sides and the top Rock Wall Board with four 2 wood screws.
A T-NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT. 3: Thread the other end of the Rope through the hole in the Bottom Rock Wall Board.
The flat side of the Roof Starters should be placed as close together as possible near the peak without the boards overlapping. 2: Install one 5/16 x 3-1/2 Lag Screw with 5/16 washer into the empty holes in all of the 2 x 6 parts at the base of the play set frame. The guide can be downloaded in full at www.cpsc.gov/cpscpub/pubs/325.pdf 1.
As with any wooden product that spends its entire life outside, in varying elements, it is important to know what to expect with your new swing set so that your family can enjoy it for many years. 2: Place the Ladder Steps into the channels, and then place the second Ladder Side on top, with the channels facing down. If the top part of the stake twists when it encounters a rock or root you may have to bend the top portion of the stake against the swing leg.
Attach Logo Plate here with 2 wood screws. Swings should have a fall zone extending a minimum of 6 from the outer edge of the support structure on each side. Step 34: Arched Side Top Boards 1: Place one Arched Side Top Board on the front/rear side of the play set at the top. PRE-DRILL LAG SCREW DIRECTIONS Pre-drilling holes for lag screws will make it easier to drive the screws in by hand. Step 48: Safety Handles 1: Place the Safety Handles centered onto the Panel Slats above the Ladder. The bottom edge of the 90o brackets should be 3/4 up from the bottom edge of the 2 x 4. Step 18: Panel Slats 1: Locate nineteen 5/4 x 3 x 28 Panel Slats.
Use a hammer to set each t-nut flush with the board. Step 22: Rock Wall 1: Locate two bags of Climbing Rocks.
Step 37: Roof Boards/Roof Finishers and Chimney and Dormers 1: Place the 1 x 5 x 52 Roof Boards on top of the Roof Supports, fitting the tongue into the groove of the Roof Starter. 2. Once you have a level and square play set frame you may install lag screws. If you construction area is sloped then some measurements may change.
We back Fax this completed form to: option 1 (800) 880-3300 Mail this completed form to: Gorilla Playsets 190 Etowah Industrial Court Canton, GA 30114 OR our products with an unparalleled warranty. 2: Fasten the Swing Beam to the Swing Beam Plate and Swing Beam Support using a 9 carriage bolt with a torque washer on top and a 3/8 lock nut and washer on the bottom. IMPORTANT DOCUMENTS CUSTOMER MUST READ AND RETAIN Please go to the following links and read important SAFETY information prior to using your new play structure. 2. 1: Flip the Ladder Side over so that the channels are facing up. Attach each Bottom Panel Board with one 5/16 x 3-1/2 lag screw and 5/16 washer. Hammer the t-nut until it is flush/ almost flush to the corner posts. 2: Place the Climbing Rocks in a staggered pattern on the Rock Wall Boards. Maximum Allowable swinging weight for a three position swing: 1) The maximum allowable swinging weight at each Swing Belt position is 150 lbs.
2 x 4 x 47-3/8 Deck Support (offset holes down) 5/16 Washer 5/16 x 4-1/2 Hex Bolt Note: Panel Support Board removed for clarity. Step 8: Fort Supports 1: Place a 5/16 Tee Nut into the hole in the Fort Supports as shown. SITE PLAN: Ladder Rock Wall Swing Belts (2) Trapeze Arm (1) Wave Slide Note: measurements shown are based upon starting with a flat construction area.
THE T-NUT HAS A BARREL SHAPED END WHICH GOES INTO THE HOLE IN THE CORNER POST. #8 X 1-1/2" WOOD SCREW DORMER ROOF (LEFT SIDE) DORMER ROOF (RIGHT SIDE) COMPLETED ROOF ASSEMBLY FRONT ROOF EDGES FLUSH TO ONE ANOTHER HERE. Remove the staples and/or tag after the board is installed. 2: The 2 x 6 x 86 Right Sandbox Board (offset holes down) attaches to the side of the Right Corner Posts with two 5/16 x 4-1/2 hex bolts and two 5/16 washers into the topmost holes in the Right Sandbox Board. 2: ATTACH THE REAR AND RIGHT SIDES OF THE CHIMNEY WITH A 2" WOOD SCREW. USE A 2" WOOD SCREW IN THIS LOCATION CHIMNEY FRONT CHIMNEY LEFT SIDE 1: FIND THE REAR AND RIGHT SIDE OF THE CHIMNEY. On the end of each board there should be a small white tag that is stapled or stuck into place. 2: Tie a secure knot on the inside of the Rock Wall Side Top Panel Board. Make sure the Rock Wall Board is flush with the ends and sides of the Rock Wall Side boards. When using the drill bit you will have to "spot" drill the post and then remove the board you are attaching to finish drilling the hole. 2: Attach a Face Board to the front of the Left Corner posts making sure the top side is flush with the top side of the Panel Supports.
5/4 x 3 x 23-7/8 Rock Wall Top Cap 2 Wood Screw Flush to top Rock Wall Board.
Step 43: Hanging The Swings 1: Clip each of the Spring Clips onto the Iron Ductile Swing Hangers, then clip onto the swing chains.
Identify all of the parts for your play set. 3: Place bolt caps over exposed threads after securing. http://www.gorillaplaysets.com/Swing-Set-Safety-s/85.htm https://www.gorillaplaysets.com/Maintenance-s/129.htm http://www.gorillaplaysets.com/manuals.html (Click on your specific model) http://www.gorillaplaysets.com/Warranty-s/82.htm NOTE: Your childrens safety is our #1 concern. 3: Arrange six 5/4 x 2 x 13 Small Rays on either side of the Large ray (three small rays per side) as shown below. 2: The barrel of the t-nut should go in the hole first. Attach the Panel Support with two 5/16 x 4-1/2 hex bolts and 5/16 washers. Place one rock on each board except for the bottom rock wall board with the hole in it. Sit the swing beam legs upright. Step 46: Steering Wheel 1: Place the Steering Wheel Insert inside the Steering Wheel.
The weight limit for a Trapeze Bar is 125 lbs. **For Residential Use Only** *Note - You may need to apply more than one gallon depending on swing set size, wood texture and porosity. 2: Fasten the Swing Beam Plate to the Swing Beam Support on the outside holes using 3/8 x 3-1/2 carriage bolts from the top and 3/8 washers with 3/8 lock nuts on the bottom. 2: ATTACH THE FRONT AND LEFT SIDES OF THE CHIMNEY WITH A 2" WOOD SCREW. 3: Attach the Face Board with six 2-1/2 wood screws. USE THE DIAGRAM BELOW AS A GUIDE FOR A SUGGESTED PLACE TO MOUNT THE CHIMNEY. Fasten the Sun to the Sun Support with two 3 wood screws.
Step 40: Window Supports/Windows In this step the wood components to attach windows will be installed on the inside of the left of the playset. 3: Drill 3/8 holes where marked.
Warranty registration - nantucket Gorilla Playsets manufactures 3 Easy Ways To REgisTER the finest quality products that are designed for outstanding strength and durability. Place bolt caps over exposed threads after securing. 3: Attach each Deck Spacer to the Deck Supports with two 2 Wood Screws.
2: AFTER INSTALLING THE CHIMNEY MOUNTING BLOCK PLACE THE CHIMNEY ASSEMBLY ON THE ROOF SO THAT THE INSIDE OF THE BACK WALL RESTS AGAINST THE BLOCK. Four Panel Slats will be installed at both the left, rear and front of the play set.
IMPORTANT: Make sure the Tic Tac Toe Board is mounted to the Green Plastic Bracket observing the 1-5/8 dimension shown below. ATTACH THE DORMER SUNBURST TO THE ROOF WITH TWO #8 X 1-1/2" WOOD SCREWS.
Splinters, large cracks, and decayed wood components. PLEASE RETAIN ALL INSTRUCTIONS FOR FUTURE REFERENCE. Attach each Panel Slat to the inside of the Panel Supports with two 2 wood screws for each Panel Slat. 2: Attach each Arched Side Top Board through the top hole into the t-nut in the corner post with 5/16 x 4-1/2 hex bolts and 5/16 washers. Step 7: Leveling the Play Set and installing Lag Screws 1: Level your play set frame. No t-nuts will be installed in the Right Corner Posts where shown below. A safety surface such as mulch or recycled tire should be used under the play set to prevent injury from falls. THE T-NUT ALSO HAS AN FLANGE SHAPED END WITH TEETH.
1.
Attach the Large Ray to the Roof Support and Sun with two 1-1/2 wood screws.
Step 4: Rear Sandbox/Panel Support Board 1: The 2 x 4 x 47-3/8 Panel Support (offset holes down) attaches to the side of the Right Corner Posts with two 5/16 x 4-1/2 hex bolts and two 5/16 washers. STEP 4: CHIMNEY 1: FIND THE FRONT AND LEFT SIDE OF THE CHIMNEY. Step 38: Sun Support and Sun 1: Place a 2 x 4 x 43-3/4 Sun Support underneath the Roof Supports. Step 32: Level The Swing Beam 1: Place a level on top of the Swing Beam and adjust the legs in or out as needed to make the Swing Beam level. Step 45: Flag Kit 1: Place the Flags on the FRONT (slide side) side of the play set centered on the corner posts. 3) The MAXIMUM SWING BEAM LOAD IS 425 lbs. 1: Attach the 5/4 x 6 x 20 Vertical Window Support in the center with 2 wood screws. Step 23: Rock Wall 1: Place the 5/4 x 3 x 23-7/8 Rock Wall Top Cap on top of the Rock Wall Sides flush with the top Rock Wall Board. Seven Panel Slats will be installed at the right of the play set. Step 30: Swing Beam to Swing Legs 1: Fasten the Swing Beam to the Swing Leg Bracket using 3/8 x 6-1/2 carriage bolts with torque washers on top of the Swing Beam, and 3/8 lock nuts with 3/8 washers underneath. An offset hole is one that is closer to one side than it is the other or in other words, it is not centered on the board.
This white identifcation tag displays the thickness, width, length and an abbreviated description of the part.
2: Fasten the tapered side of each 90o Green Bracket to each Rock Wall Side with a 5/16 x 1-1/2 hex bolt and 5/16 washer. 2: Fasten the Iron Ductiles to the Swing Beam using 3/8 x 7 carriage bolts with torque washers on top of the Swing Beam, and 3/8 lock nuts with 3/8 washers on the bottom.
2) The maximum allowable swinging weight at the Trapeze position is 125 lbs. 2 x 4 x 47-3/8 Face Board 2-1/2 Wood Screws (3 per side) Top of Face Board should be flush with tops of Panels Supports. Make sure the Sun Support is level. Attach the Sun Support through the pre-drilled holes in the bottom to the Roof Supports with two 2-1/2 wood screws.
Safety and Maintenance Tips for Your New Play Set: (continued) Playgrounds should be inspected on a regular basis.
Step 20: Rock Wall 1.
The structure should be able to stand on its own, without any support, at this stage. REPEAT SUBSTEPS 1 THROUGH 4 FOR THE DORMER ON THE OTHER SIDE OF THE ROOF. 2: Level the Swing Leg Cross-Member, and secure to the Swing Legs with 3/8 x 3-1/2 lag screws and 3/8 washers. PICTURE DESCRIPTION 4 X 4 X 96" SWING LEG 4-4-9600-SL 4 X 6 X 108" SWING BEAM 4-6-10800-SB 5/4 X 2 X 13" SMALL RAY 125-2-1300-SR 5/4 X 2 X 17" LARGE RAY 125-2-1700-LR 5/4 X 2-1/4 X 111/2" HORIZONTAL WINDOW SUPPORT QTY. 2: Secure the Slide to the Deck Boards with three #14 x 1-1/4 pan head screws. PICTURE VIEWS SHOWN ABOVE ARE 1:1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES. "Nominal Lumber" at a home center will measure 11/2" for the thickness.
STEP 6: CHIMNEY 1: FASTEN THE 5/4 X 3 X 6-3/4" CHIMNEY MOUNTING BLOCK TO THE ROOF WITH #8 X 1-1/2" WOOD SCREWS. 3: Use the diagram below to correctly identify and orient the necessary direction the posts should face. 2: PREDRILL 7/64" PILOT HOLES BY 1/2" DEEP INTO THE ROOF SIDES AT EACH HOLE LOCATION. Make sure the iron ductiles are facing down. Step 9: Deck Spacers 1: Place a 5/4 x 4 x 40-1/2 Deck Spacer between the Left and Right Corner Posts on top of the Deck Supports as shown below. YOU CAN PLACE THE BLOCK AT ANY DESIRED PLACE ON THE ROOF. The 4 x 4 x 47-3/8 Swing Beam Support has counter-sunk holes in the center and on the ends.
Stationary climbing equipment and slides should have a fall zone extending a Minimum of 6 in all directions from the perimeter of the equipment. 3: FASTEN THE CHIMNEY TO THE CHIMNEY MOUNTING BLOCK WITH A #8 X 1-1/2" WOOD SCREW IN EACH SIDE. Repeat for the other side of the roof. Step 14: Deck Boards 1: Seven 5/4 x 6 x 47 3/8 Deck Boards will lay across the Deck Supports, flush to the Face Boards.
As your swing set acclimates to its new environment, natural characteristics of the wood can show in the form of checks, or cracks in the lumber. Place bolt caps over exposed threads after securing. IMPORTANT PLEASE READ Congratulations! Note: One Panel Support Board was removed for clarity. 2: Place the bottom of a 2 x 4 x 47-3/8 Panel Support with offset holes down on the marks. Pay attention to the DIAMETER of the lag screw you are installing. 2: Place the 2 x 4 x 47-3/8 Panel Support on top of the 2 x 4 at the right side of the play set with offset holes down. Check the diagonals for square.
1: Have one person line up the hole in the end of the Swing Beam with the middle hole on the Swing Beam plate. (See Detail A) 4: Place each Fort Support against the Corner Post. Step 11: Face Boards 1: Locate two 2 x 4 x 47-3/8 Face Boards. 3: Attach each Arched Side Top Board through the bottom hole into the corner posts with 5/16 x 3-1/2 lag screws and 5/16 washers. 3: Place the base of the Telescope into the cut out area of the L-shaped bracket. 2: Place the 2 x 4 x 47-3/8 Panel Support against the rear of the play set with offset holes up. 2: Lay out each of the 4 x 4 x 96 Corner Posts in the area you intend on building the fort side of the playset. 4: Attach the 90o brackets to the 2 x 4 with two 1-1/2 hex bolts and two 5/16 washers. Level side to side and front to back. Inside each bag should be five rocks, fifteen #14 x 1-1/4 pan head screws and fifteen 1/4 flat washers. Your instruction book will have detailed drawings that will make it easy for you to recognize individual parts. Locate ten 5/4 x 5 x 23-7/8 Rock Wall Boards and one 5/4 x 5 x 23-7/8 Bottom Rock Wall Board with one big hole in it. 2: From the inside of the Right Panel Board loosely attach each Fort Support with one 5/16 x 2-1/2 Hex Bolt and one 5/16 washer. Step 16: Panel and Panel Support Boards 1: Place the 2 x 4 x 12 Bottom Panel Board - Left and 2 x 4 x 12 Bottom Panel Board - Right on top of the 2 x 4s as shown below with offset holes up. PICTURE DESCRIPTION 1 X 5 X 52" ROOF FINISHER (TONGUE ONLY) QTY. 3: Count back the same number of links on the opposite side to ensure that the swing is level, and adjust to fit your needs.
2: Attach the two 1-3/8 x 1-5/8 x 10-1/2L Tic Tac Toe Boards to the Green Plastic Brackets with the 1L phillips head screws provided in the Tic Tac Toe box. 2: Make sure the Rock Wall is level.
2: Use the clips to adjust the height of the swing by clipping onto higher or lower links.
2: At the right of the play set center one Panel Slat over the center of each deck board. PICTURE DESCRIPTION TELESCOPE 07-0001 STEERING WHEEL QTY.
Step 39A: Crown 1: Place the Crown on top of the Sun wood part above the rock wall. This refers to the orientation of the holes on the board. 2: Place the 5/4 x 2 x 17 Large Ray centered under the peak of the Roof Supports. Step 19: Rock Wall 1: Locate two 2 x 4 x 57 Rock Wall Side boards. Line up the pre-drilled holes and rest the swing beam on top of the fort and swing legs. Step 31: Swing Beam to Fort *An extra person is required for this step. You may drill 1/8 pilot holes through the center of the pockets in the slide if you wish. 11-0020 301/301D Hardware PAGE 1 OF 2 REV: B 9/16/2015 JH #14 X 1-1/4" PAN HEAD SCREW QTY: 6 9 #8 X 1-1/4" WOOD SCREW QTY: 8 #8 X 1-1/2" WOOD SCREW QTY: 106 8 #8 X 2" WOOD SCREW QTY: 191 7 #8 X 2-1/2" WOOD SCREW QTY: 34 #8 X 3" WOOD SCREW QTY: 14 6 5 5/16" TEE NUT QTY: 42 4 3/8" LOCK NUT QTY: 19 3 TORQUE WASHER QTY: 17 3/8" WASHER QTY: 31 2 1 5/16 X 4-1/2" HEX BOLT QTY: 32 5/16" x 2-1/2" HEX BOLT QTY: 2 5/16 X 1-1/2" HEX BOLT QTY: 8 5/16" WASHER QTY: 68 USE THE RULER TO THE RIGHT TO MEASUR. Mark the position of the bracket holes on the 2 x 4. The face of the Sun should be flush with the face of the Sun Support.