An additional 310 megawatts of peaking capacity went into service at this location in December 2006. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.
Excel: Contact Geographic Information Systems (GIS), Get Information About the Volkswagen Settlement, Florida Mitigation Fund, Protect the Environment from Solid and Hazardous Wastes, Environmental Accountability and Transparency, Ad Valorem Tax Assessment of Pollution Control Devices, Florida Department of Environmental ProtectionSouthwest District, Southwest Florida Water Management District. Seminole is also a not-for-profit Cooperative returning margins to your Cooperative. The project got commissioned in December 2006. The following icons link to free Reader/Viewer software:
Florida Department of Environmental Protection, Your JavaScript is turned off limiting this websites functionality, (*copy the id # and paste into the Facility ID field to locate associated Permits). Mitsubishi Power Aero supplied electric generator for the project. Seminole operates power production facilities and negotiates short and long term energy contracts with other power producers and marketers. Richard J. Midulla Generating Station is a 310MW gas fired power project. Carmen is a robot, or rather an algorithmic journalist, who creates valuable automated content for our audiences.
Seminole provides power to more than 750,000 members. The primary fuel being used to power the plant is natural gas. I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the, Introducing the Excellence Awards & Rankings 2022, Industrial solutions for power generation, Power industry venture financing deals total $1.9bn globally in June 2022, Europes power industry saw a rise of 16.67% in cross border deal activity during June 2022, Power industry cross border deals total $15.9bn globally in June 2022. Withlacoochee River Electric Cooperative, Inc.. Midulla generating station is an 853-megawatt (MW) fuel oil and natural gas power station in the state of Florida, United States. It uses natural gas as its primary fuel source. Your live chat conversation transcript may be appended to your Withlacoochee River Electric Cooperative customer file. Some content on this site is saved in an alternative format. The fuel is procured from Florida Gas TransmissionCompany, Gulfstream Natural Gas System, LLC. The Midulla Stations 500 megawatt combined cycle unit began commercial operation in 2002. By using this service you acknowledge and agree that Withlacoochee River Electric Cooperative, Inc. has no liability for any injury, loss or damage arising out of or connected with the use of this live chat service. It has been developed in single phase. Tick the boxes of the newsletters you would like to receive. Rotating Machine Services (up to 600MW) | HV / LV Contracting Services, Innovative Energy Solutions for the Power Industry, Moisture Meters and Humidity Sensors for Measuring Water Vapour in Power Plants, Thank you for subscribing to Power Technology. The project is currently owned by Seminole Electric Cooperative. The company provided 5 units of FT-8 Twin-Pac gas turbines, each with 62MW nameplate capacity. Interested in subscribing to DEP newsletters or receiving DEP updates through email? Located in Hardee County, northwest of Wauchula. This page was last edited on 4 February 2022, at 16:33. The power plant run on dual-fuel.
The power industry's most comprehensive news and information delivered every month. Located in Putnam County, about 50 miles south of Jacksonville. "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2018", "www.seminole-electric.com/about/history/", "U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (November 2019)", "U.S. Energy Information Administration, Preliminary Monthly Electric Generator Inventory (July 2021)", https://www.gem.wiki/w/index.php?title=Midulla_generating_station&oldid=284871, Creative Commons Attribution-NonCommercial-ShareAlike. It is located in Florida, the US. The top stories of the day delivered to you every weekday. Summary of Submittals required by Conditions, Original Final Order of Certification and, if applicable, Land Use Consistency. It also owns and operates transmission facilities that connect Seminoles system to Floridas electrical transmission system. Seminole owns and maintains more than 350 miles of transmission line. A weekly roundup of the latest news and analysis, sent every Wednesday. Withlacoochee River Electric Cooperative will never ask you to disclose confidential information such as complete Social Security numbers or Credit Card information through Live Chat. © 2022 Withlacoochee River Electric Cooperative, Inc. All rights reserved. PDF: |
Seminole Electric Cooperative, headquartered in Tampa, is your Cooperatives wholesale energy supplier. Please do not share this information through live chat. The vision of the Florida Department of Environmental Protection is to create strong community partnerships, safeguard Floridas natural resources and enhance its ecosystems. The map below shows the exact location of the power station in Bowling Green, United States. Your Touchstone Energy Cooperative. The project is currently active. Two 650 megawatt, coal-fired generating units. We will not disclose live chat details to third parties. Power industry news, data and in-depth articles on the global trends driving power generation, renewables and innovation, Receive our newsletter - data, insights and analysis delivered to you. Carmen's focus is to deliver deep, fact-based articles and to free up our human journalists to interpret, analyse and explain developments. The Florida Department of Environmental Protection is the states lead agency for environmental management and stewardship protecting our air, water and land. Seminole is owned by WREC and eight other distribution cooperatives. Mitsubishi Power Aero was selected as the turbine supplier for the Gas fired project. The project generated 75,597MWh of electricity. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. Word: |
Withlacoochee River Electric Cooperative may keep transcripts of your live chat for quality assurance purposes.
Seminole Electric is owned by your Cooperative and eight other electric distribution cooperatives located from the Georgia border to the Everglades. The site certification includes a 2-on-1 combined cycle unit, comprised of two nominal 157 MW combustion turbines (CT Units 1and 2) with associated heat recovery steam generators and a nominal 173 MW steam turbine-electric generator, and associated support facilities. These distribution Cooperatives provide power to more than 1.7 million individuals and businesses across the state through nearly 800,000 meters in 42 counties. It is a Gas Turbine power plant that is used for Peakload. Post completion of construction, the project got commissioned in December 2006. The project cost is $449.175m. {"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"600px","height":"500px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":16,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":27.6417,"lon":-81.962500000000006,"icon":""}]}. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponents news, deals and financial reporting, regulatory body, associations, government planning reports and publications. All power projects included in this report are drawn from GlobalDatas Power Intelligence Center. A $280 million emission control upgrade, completed in 2009, keeps this Station one of the cleanest coal-fired generating facilities in the U.S.